Next: Initial Setup
Up: RTPL: a Package to
Previous: Conclusions
Proposal Start Setup TEN-155
In this section we make a proposal for a start setup for a
performance test with as subject the TEN-155 network. Because this test
will interfere with the measurements at the IPP - FOM setup
(subsection 3.3), these tests will be stopped
during the TEN-155 test period.
In first instance only workstations at the NRN backbones (possible also
off-backbone workstations) will be used. In the sequel also TEN-155
on-backbone workstations will be added.
Hans Blom
2000-02-22